In October they ask about March 12.
The record answers.

A back charge lands six months after the day it argues about. The daily report already settled it: who was on site, what got done, what was delivered with the ticket number on it, and the photos to match, filed from the job the day it happened. That is what xBuild Sub is: your side of every job, on the record.

  • Daily reports from the site
  • Punch and photos on the day
  • Every job, one record
xbuild · Daily report
Daily report
DK

Daily report

Jun 28 · submitted 4:30 PM · Supt. Dave Kuhns

On site

Weather

72°

78 / 61 · 6 mph · 0.00 in

Crews

4

on site

Workers

18

across 4 firms

Deliveries

2

received

Man-hours

144

logged today

Safety

0

incidents

Who is on site

Firm · trade

  • AllstarSelf-perform

    Concrete

    6
  • ABC Mechanical

    HVAC and plumbing

    5
  • Keystone Drywall

    Drywall and framing

    4
  • Penn Electric

    Electrical

    3
4 firms18 workers

Daily task list

4 items

  • Set RTU-1 to RTU-4 curbs, Zone A

    Mechanical

    Done
  • Pour slab infill Zone C

    Concrete

    Done
  • Hang GWB Suite 110

    Drywall

    In progress
  • Stock electrical room

    Electrical · gear not delivered

    Blocked

Field sketches

3 markups

Sketch
RTU curb layout, Zone A
Sketch
Slab infill edge detail, Zone C
Sketch
Wall type at corridor 100

Deliveries

2 received

Vendor and materialQtyTime

Reading Ready-Mix

Slab mix, 6 in · #RM-4471

42 CY7:10 AM

Trane Supply

RTU curb adapters · #TS-2298

4 ea9:05 AM

Equipment on site

4 units

Rough terrain crane, 90 ton

Aable Crane

8.0 h

Telehandler, 10k

United Rentals

6.5 h

Skid steer

United Rentals

4.0 h

Concrete buggy

Allstar

5.0 h
SafetyToolbox talk: crane pick zones and rigging signals.0 incidents · 0 near misses

The day, on the record.

The daily report

Filed before the tailgate closes.

Filed from the site

The report is written where the work is, before the gate locks. Not reconstructed Friday from memory and a group text.

Deliveries with the ticket

Vendor, material, ticket number, quantity, and the time it hit the ground. The argument about the short load is over before it starts.

Blocked says why

A task that could not happen carries its reason. Gear not delivered is on the record the day it cost you, not remembered later.

01 / The paper

Their paper, answered from your record.

Every job comes with the general contractor’s paper: submittals to get through, RFIs to answer, change orders to price. xBuild Sub keeps it on the job record with the ball in court and the date on every item, so the thing holding up your work has a name on it and the extra work you did has a trail.

  • Submittals and RFIs by job, with who owes the answer and when.
  • Change orders carry the dollars and the status from pricing to approval.
  • The paper lives on the job, not in whoever’s inbox it landed in.
xbuild · Sub / Workflow
Workflow / Northgate Commons Open items

Open RFIs

6

2 awaiting reply

Submittals

6

2 under review

Change orders

$184.7k

4.4% of contract

Open items

Ball in court

Rooftop unit curb height vs parapet flashing clearance

RFI 002 · Architect · Jun 19

Open

Storefront and curtain wall system, Entry A and B

SUB 007 · Architect · Jun 28

In review

Roof deck repair at Zone C, corroded panels

CO 003 · Owner · Jun 30

Open

Curtain wall embed plates in existing CMU

RFI 005 · Engineer · Jun 26

In review

Rooftop HVAC equipment schedule

SUB 015 · Mech engineer · Jun 16

Approved

Floor tile abatement in Zone D

CO 001 · Owner · Jun 05

Approved

The ball in court, named.

xbuild · Sub / Field
Field / Northgate Commons On site

Weather

72°

Clear

Crews

3

on site

Workers

18

today

Deliveries

2

received

Daily log

Jun 28 · submitted 4:30 PM

  • MechanicalSet rooftop curbs at RTU-1 through RTU-4, Zone A.
  • ConcreteSlab infill at Zone C, 42 CY placed and finished.
  • DrywallHung gypsum board at corridor 100 and Suite 110.

Punch and field notes

2 open

  • Seal deck penetration at the new infill

    Zone C

    In review
  • Touch-up paint at door frames

    Suite 110

    Open

Today's photos

RTU
Zone C
Corridor
Slab

The day, as it happened.

02 / Proof

You were there. Prove it.

The field record is the argument you do not have to have. Crews by firm and head count, the day’s work by trade, punch items with their status, and photos tied to the day they were taken. When the job goes sideways, the sub with the record is the sub who gets paid.

  • The daily log reads by trade: what got done, where, by whom.
  • Punch items carry their status and their spot on the job.
  • Photos stay with the day they were taken, not loose in a camera roll.
The rest of it

The record the job keeps for you.

The schedule

Your activities and dates on a real Gantt, by job, so the week reads before Monday does.

Crews on site

Who was there, by firm and head count, every day. The manpower question has a lookup instead of a guess.

Photos on the day

Field photos ride the daily report, so the picture and the date that makes it evidence stay together.

Change orders

The extra work carries paper: priced, submitted, and tracked to approval instead of promised at the fence line.

Equipment hours

The crane, the lift, and the skid steer log their hours on the day, whether they are yours or rented.

Documents

Drawings, specs, and the job paper on the record, so the field and the office read the same set.

Straight about it

What is not here yet

This page only claims what the software does today. These are the ones you would find in the first month, so they are named here instead of in a support ticket. When they ship, this page changes the same day.

See the roadmap
  • No field time. Crew hours do not land on cost codes the day they happen yet; that is queued next.
  • No billing. Pay applications, the schedule of values, and retainage are on the roadmap, not the record.
  • No transmittals on drawing revisions. Who received which set still rides on the email that sent it.
Ownership

You buy it. You keep it.

You own your trucks, your tools, and your scaffolding. Own the software too. Approved companies buy a lifetime license once. There is no per-seat fee that grows every time you hire a foreman, and the job records, daily reports, and photos stay your company’s to export in full.

The work got done. Put it on the record.

xBuild Sub is built by people who have eaten a back charge they did not owe. It is running live jobs today, and access is by request while approved companies come on.